Construction Scheduling Contractors in California, KY

1,438 Results within

Market Sector
Company Type
Business Classification
Trades and Services (2)
Construction Scheduling
Project Management and Coordination
Clear All Filters
Company Logo

BRUNS-PAK

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Architect, Consultant, Engineer, General Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional
Communications, Design and Engineering, Electrical, Fire Suppression, Heating Ventilating and Air Conditioning HVAC, Plumbing, Project Management and Coordination
At BRUNS-PAK, we set the industry standards, making a smarter, more sustainable, more robust world. Our proven services methodology integrates planning through design, engineering, construction, and commissioning to deliver robust infrastructures on time and budget across on-premise, cloud-based and managed facilities. BRUNS-PAK helps clients strategize, implement and provision innovative, resilient solutions for mission-critical data center infrastructure that support operations in an always-on world flooded by data and demanding information connectivity through an ever-expanding array of devices.

CES, Inc.

Alabama • Arizona • Arkansas • California • Colorado • Florida • Georgia • Illinois • Indiana • Kansas • Kentucky • Louisiana • Mississippi • Missouri • Nevada • New Mexico • North Carolina • Ohio • Oklahoma • Pennsylvania • South Carolina • Tennessee • Texas • Utah • Virginia • West Virginia • Wyoming
Consultant
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional
Airfield Construction, Appraisers and Valuation Services, Aquariums, Communications, Concrete, Concrete Finishing, Construction Scheduling, Curbs Gutters Sidewalks and Driveways, Earthwork, Electrical, Electrical Utilities High and Medium Voltage Distribution, Electronic Security, Estimating, Existing Conditions Assessment, Fire Suppression, Furnishings, General Commissioning Requirements, HVAC General, Integrated Automation Systems For Conveying Equipment, Masonry, Metals, Other Conveying Equipment, Planetariums, Plumbing, Preconstruction Bidding, Project Management, Project Management and Coordination, Roadway Construction, Sidewalks, Thermal Insulation, Value Analysis Engineering
Computerized Estimating Services (CES) is a Women-Owned firm established in 1988. We specialize in commercial construction cost estimating and scheduling services across the United States. We serve architects, owners, developers, and general contractors. At CES, our mission is to deliver every project with precision and provide our clients with peace of mind. We approach each endeavor with integrity and intention, always striving to “count the cost” to make each client's vision a reality — ensuring thoughtful planning, transparent communication which results in seamless execution of the project from start to finish. At the start of each project, CES collaborates closely with the client and design team to thoroughly evaluate the scope of work for each discipline. We engage with the design teams from the earliest stages of document development, during which we: - Evaluate unique project requirements, including utilities, grading, storm drainage, and traffic flow. - Identify existing above- and below-grade structures that may need to be removed. We conduct comprehensive research on relevant site conditions in collaboration with the design team, ensuring all factors are seamlessly integrated into the estimate. Our estimates adhere to the MasterFormat standard at every design phase, leveraging tools like BlueBeam, RSMeans, CAD, and MII to deliver: ✔ Clear summary sheets ✔ Detailed exclusions and clarifications ✔ Itemized general conditions ✔ Detailed comprehensive pricing breakdown - Collaboration Review: Draft estimates are shared via email for client review, and any agreed-upon revisions promptly incorporated into the final version. - Clear Communication: Scope-related questions are addressed directly with the client’s team, fostering transparency and accountability. - Market-Driven Pricing: Estimates reflect current local market conditions, with distinct escalation factors applied for projected start dates to midpoint of construction. - Transparent Contingencies: A clear design contingency is included and adjusted as the project evolves, with no hidden costs. - Change Tracking: Estimates beyond the Schematic Design Phase include a CSI 50-Division comparison column to clearly track changes from prior versions.
Company Logo

Manhard Consulting

Alabama • Arizona • Arkansas • California • Colorado • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Jersey • New Mexico • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Engineer
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Civil Design and Engineering, Design and Engineering, Design Coordination Services, Landscape Design and Engineering, Project Management, Project Management and Coordination, Surveying, Value Analysis Engineering
Manhard Consulting (Manhard) is a full-service consulting civil engineering, surveying, water resources, and land planning firm offering comprehensive professional services. Established in 1972, and consistently named to the ENR Top 500 Design Firm list, Manhard has been solving tough engineering challenges for over 50 years. The company is led by Donald and Peter Manhard, both registered professional engineers with more than 40 years of experience each. The qualified teams at Manhard offer innovative engineering and surveying solutions ranging from land use planning and conceptual design, to final engineering design and construction management. Our diverse client list ranges from the number one company on the Fortune 500 list to small, privately-held developers. Manhard‘s current workload includes residential (multi-family and single family), retail/commercial, mixed-use, industrial, educational, healthcare and office developments across the country. Each of our offices is backed by a nationwide network of more than 200 professional engineers, professional land surveyors, landscape architects, land planners, and LEED accredited professionals. Our local teams are familiar with local codes, requirements and procedures while our network of professionals stands ready to offer additional support. This process helps prevent bottlenecks, reduce costs and accelerate project timelines. Combined with our rigorous QA/QC procedures, we aim to provide each client with the highest quality work in the most efficient and cost-effective manner. Manhard has worked with land development and real estate firms across the country, providing buildable solutions for single-family, multi-family, student housing, active adult communities and mixed-use developments nationwide. From small redevelopments to master planned communities covering thousands of acres, the engineering teams at Manhard Consulting can address land planning, entitlements, site optimization, traffic flow, drainage, flood control, open space, landscape architecture, and other crucial issues for a successful development and thriving community. We strive to maximize the value of our client’s properties by working together for a successful project every time.
Company Logo

The Element Group

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Consultant
Commercial
3d Capture Scanning, Architectural Design and Engineering, Decorative Finishing, Design and Engineering, Design Coordination Services, Interior Design, Project Management and Coordination, Signage
The Element Group is a full-service design-build and branch transformation firm that works with community banks and credit unions nationwide. Guided by its “Every Bit Matters” philosophy, the firm partners with financial institutions to plan, design, and deliver future-facing retail branch environments that support growth, operational efficiency, and brand differentiation. The Element Group provides end-to-end services including branch strategy, architectural and interior design, construction management, brand integration, digital signage, custom millwork, and staff training. With deep expertise in financial services and a collaborative, turnkey approach,

Frequently Asked Questions

How many Construction Scheduling contractors in California, KY are on the Procore Construction Network?

There are currently 1,438 Construction Scheduling contractors in California, KY on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in California, KY?

The Procore Construction Network allows you to search for Construction Scheduling contractors in California, KY that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in California, KY join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in California, KY cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in California, KY on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.

How many Construction Scheduling contractors in California, KY are on the Procore Construction Network?

There are currently 1,438 Construction Scheduling contractors in California, KY on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in California, KY?

The Procore Construction Network allows you to search for Construction Scheduling contractors in California, KY that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in California, KY join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in California, KY cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in California, KY on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.