Construction Scheduling Contractors in Merlin, OR

1,295 Results within

Market Sector
Company Type
Business Classification
Trades and Services (2)
Construction Scheduling
Project Management and Coordination
Clear All Filters
Company Logo

Lentec Inc.

Alabama • Alberta • Arizona • Arkansas • California • Colorado • Florida • Georgia • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Brunswick • New Mexico • Oklahoma • Oregon • Saskatchewan • South Carolina • South Dakota • Tennessee • Texas • Utah • Washington • Wisconsin • Wyoming
Architect, Consultant, Engineer, General Contractor, Specialty Contractor, Supplier
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Agricultural Equipment, Architectural Design and Engineering, Bridges, Bulk Material Processing Equipment, Fabricated Engineered Structures, Fabricated Wall Panel Assemblies, Manufacturing Equipment, Mechanical Design and Engineering, Metal Fabrications, Metals, Project Management and Coordination, Sheet Metal Roofing, Stainless Steel Framed Entrances and Storefronts
Lentec Inc. is a Architect, Consultant, Engineer, General Contractor, Specialty Contractor, Supplier that serves the Red Bluff, CA area and specializes in Agricultural Equipment, Architectural Design and Engineering, Bridges, Bulk Material Processing Equipment, Fabricated Engineered Structures, Fabricated Wall Panel Assemblies, Manufacturing Equipment, Mechanical Design and Engineering, Metal Fabrications, Metals, Project Management and Coordination, Sheet Metal Roofing, Stainless Steel Framed Entrances and Storefronts.
Company Logo

Pro-MEC Engineering Services, Inc.

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Engineer, General Contractor, Specialty Contractor
Industrial and Energy
Demolition, Design and Engineering, Dumbwaiters, Electrical, Elevators, Escalators and Moving Walks, General Construction Management, Heating Ventilating and Air Conditioning HVAC, Lifts, Other Conveying Equipment, Project Management and Coordination, Scaffolding, Structural Steel, Turntables
Pro-MEC Engineering Services, Inc. is a Engineer, General Contractor, Specialty Contractor that serves the Grand Ledge, MI area and specializes in Demolition, Design and Engineering, Dumbwaiters, Electrical, Elevators, Escalators and Moving Walks, General Construction Management, Heating Ventilating and Air Conditioning HVAC, Lifts, Other Conveying Equipment, Project Management and Coordination, Scaffolding, Structural Steel, Turntables.
Company Logo

Lynn Energy Services

Calgary, AB • Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Consultant, Engineer, Specialty Contractor, Supplier
Industrial and Energy
Commissioning, Communications, Electrical, Electrical Design and Engineering, Electrical Power Generation, Fabricated Engineered Structures, Fire Detection and Alarm, Gas Detection and Alarm, General Commissioning Requirements, Instrumentation and Control For Electrical Systems, Instrumentation and Control For Fire Suppression System, Integrated Automation Battery Monitors, Integrated Automation Software, Integrated Automation Systems For Electrical, Integrated Automation Systems For Electronic Safety, Integrated Automation Systems For Facility Equipment, Integrated Automation Ups Monitors, Project Management and Coordination, Site Controls
Lynn Energy Services Group, based in Humble, Texas, is a specialized energy services company providing a range of solutions for the oil, gas, and renewable energy industries. The company focuses on project execution, equipment solutions, and field services, supporting energy infrastructure across multiple sectors. Key Services & Capabilities: Midstream & Upstream Services – Installation, maintenance, and operations support for pipelines, processing facilities, and production assets. Engineering & Construction – Providing turnkey solutions for energy infrastructure projects, including design, fabrication, and construction. Compression & Process Equipment – Offering equipment solutions such as gas compressors, skids, and related process systems. Renewable Energy & RNG Projects – Supporting sustainable energy projects, including renewable natural gas (RNG) and hydrogen infrastructure. Field Services & Maintenance – Skilled technicians for equipment commissioning, troubleshooting, and routine maintenance. Lynn Energy Services is committed to safety, reliability, and innovation, ensuring clients receive high-quality services that improve efficiency and maximize asset performance. The company serves a wide range of clients, from major operators to independent producers, helping them achieve their operational goals in an evolving energy landscape.
Company Logo

NATIONAL MEDIA SYSTEMS

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Specialty Contractor
Commercial, Residential
Audio Video Communications, Communications, Design and Engineering, Electronic Security, Entertainment and Recreation Equipment, Integrated Automation Network Devices, Integrated Automation Network Gateways, Integrated Automation Systems For Communications, Integrated Automation Systems For Network Equipment, Project Management and Coordination, Residential Equipment, Security Detection Alarm and Monitoring, Security Equipment, Technology Design and Engineering, Video Surveillance, Window Treatments
National Media Systems provides End-to-End Design, Procurement, Installation and Technical Support for Network (WAN/LAN), Audio, Video, CCTV, Lighting Control, and Window Treatment Automation solutions for Commercial and Residential clients across the United States.

Pacific Hydrotech Corporation

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
General Contractor
Commercial, Industrial and Energy, Infrastructure
Concrete, Demolition, Design and Engineering, Earthwork, Flooring, General Construction Management, Glass and Glazing, Heating Ventilating and Air Conditioning HVAC, Masonry, Painting and Coatings, Plaster and Gypsum Board, Project Management and Coordination, Roofing, Rough Carpentry, Structural Steel, Wood Framing
Pacific Hydrotech Corporation is a General Contractor that serves the Santa Cruz, CA area and specializes in Concrete, Demolition, Design and Engineering, Earthwork, Flooring, General Construction Management, Glass and Glazing, Heating Ventilating and Air Conditioning HVAC, Masonry, Painting and Coatings, Plaster and Gypsum Board, Project Management and Coordination, Roofing, Rough Carpentry, Structural Steel, Wood Framing.

Direct Doors and Hardware Inc

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Specialty Contractor
Commercial, Healthcare, Industrial and Energy, Institutional
Communications, Curtain Wall and Glazed Assemblies, Design and Engineering, Door and Window Hardware, Doors and Frames, Electronic Security, Entrances and Storefronts, Glass and Glazing, Louvers, Project Management and Coordination, Roof Windows and Skylights, Specialty Doors and Frames, Translucent Wall and Roof Assemblies, Vents, Window Wall Assemblies, Windows
Direct Doors and Hardware Inc is a Specialty Contractor that serves the Lynchburg, VA area and specializes in Communications, Curtain Wall and Glazed Assemblies, Design and Engineering, Door and Window Hardware, Doors and Frames, Electronic Security, Entrances and Storefronts, Glass and Glazing, Louvers, Project Management and Coordination, Roof Windows and Skylights, Specialty Doors and Frames, Translucent Wall and Roof Assemblies, Vents, Window Wall Assemblies, Windows.
Company Logo

consultant

Kyle, TX • New York, NY • Alabama • Arizona • Arkansas • California • Delaware • Florida • Georgia • Idaho • Illinois • Indiana • Iowa • Kentucky • Louisiana • Maine • Michigan • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • Newfoundland and Labrador • North Carolina • Nova Scotia • Ohio • Oklahoma • Oregon • Pennsylvania • South Carolina • Tennessee • Texas • Utah • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Architect, Consultant, Engineer, General Contractor, Specialty Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
3d Capture Scanning, Architectural Design and Engineering, Architectural Wood Casework, Brick Tiling, Bridge Machinery, Bridge Specialties, Bridges, Building Information Modeling Bim, Building Modules and Components, Canvas Roofing, Civil Design and Engineering, Cleaning and Maintenance Of Existing Period Conditions, Cleaning Services, Coastal Construction, Coiling Doors and Grilles, Composite Wall Panels, Composite Windows, Concrete, Concrete Accessories, Concrete Countertops, Concrete Finishing, Concrete Paving, Concrete Tiling, Conservation Treatment For Period Roofing, Construction Scheduling, Design and Engineering, Design Coordination Services, Door and Window Hardware, Electrical, Electrical Design and Engineering, Electrical General, Fabric Structures, Fabricated Bridges, Fabricated Rooms, Flooring, General Construction Management, Glass and Glazing, Interior Design, Landscape Design and Engineering, Landscaping, Metal Fabrications, Metal Tiling, Metal Wall Panels, Metal Windows, Metals, Painting, Painting and Coatings, Project Management and Coordination, Retaining Walls, Roof and Deck Insulation, Roof Panels, Roofing, Sheet Metal Flashing and Trim, Shop Fabricated Structural Wood, Structural Glass Curtain Walls, Structural Steel, Structural Steel Framing Erection, Structural Steel Framing Fabrication, Swimming Pools, Temporary Fencing, Towers, Wall Panels, Wire Fences and Gates, Wood Doors and Frames, Wood Fences and Gates, Wood Flooring, Wood Framing
3d Capture Scanning, Architectural Design and Engineering, Architectural Wood Casework, Brick Tiling, Bridge Machinery, Bridge Specialties, Bridges,
Company Logo

ELA LIGHTING

Boston, MA • New Orleans, LA • Orem, UT • Washington, DC • Alabama • Arizona • Arkansas • California • Colorado • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kentucky • Louisiana • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • South Carolina • South Dakota • Tennessee • Texas • Utah • Washington • Wisconsin • Wyoming
Consultant, Engineer, Specialty Contractor, Supplier
Commercial, Industrial and Energy, Infrastructure, Institutional, Residential
Amusement Park Structures and Equipment, Art, Cast Polymer Fabrications, Decorative Finishing, Decorative Metal Fences and Gates, Design and Engineering, Electrical, Informational Kiosks, Manufactured Site Specialties, Metal Fabrications, Metal Faced Panels, Metals, Project Management and Coordination, Signage, Visual Display Units
A Legacy of Craftsmanship and Innovation in Lighting. Environmental Lighting for Architecture, Inc. (ELA) traces its roots back to 1929, when a group of skilled craftsmen founded the Hollywood Lighting Fixture Company (HLFC). Known for creating high-end decorative lighting for film sets, HLFC quickly gained recognition among Hollywood's elite—including directors like Alfred Hitchcock—and became the go-to source for stunning, custom fixtures used in motion pictures. ​ This reputation for excellence soon extended beyond the silver screen. Architects and designers throughout Southern California sought HLFC’s artistry, especially as the demand for sophisticated, European-inspired custom commercial lighting grew. By the 1950s, HLFC had expanded into the hospitality sector, contributing elegant lighting solutions to the booming hotel scene in Las Vegas. To better reflect its growing scope, the company rebranded as Custom and Architectural Lighting (CAL). CAL continued to deliver innovative lighting to luxury hotels while also restoring historic properties, including landmark government buildings and state capitols. ​ In the late 1970s, CAL partnered with Environmental Lighting for Architecture, Inc., a boutique outdoor lighting manufacturer known for its quality and design. The collaboration led to a full merger, and the combined company adopted the ELA name. Together, they expanded into residential outdoor lighting, while the custom division continued to influence new product lines with fresh design concepts and architectural integrity. ​ By 1982, ELA had relocated to City of Industry, California, and developed a network of high-end lighting showrooms nationwide. This move positioned the company for rapid growth and greater market reach. ​ To meet rising demand for aluminum castings, ELA established its own foundry, Fundidora Cal, in Tijuana, Mexico, in 1990. With weekly aluminum shipments from the U.S. and stringent quality controls, this vertical integration allowed ELA to maintain consistent production schedules and exceptional craftsmanship. ​ In 2022, ELA moved to a state-of-the-art manufacturing facility in Corona, California, marking a new chapter in its ongoing commitment to quality, flexibility, and innovation. ​ Today, ELA continues to offer the same attention to detail, distinctive designs, and legendary service that first made it a Hollywood favorite nearly a century ago. With advanced custom capabilities, ELA is equipped to meet the complex needs of modern commercial, hospitality, and residential projects—one fixture at a time. ​
Company Logo

VDI, Inc.

Alabama • Alaska • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
General Contractor, Owner Real Estate Developer, Specialty Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Ceilings, Countertops, Electrical, Finish Carpentry, Flooring, General Construction Management, Glass and Glazing, Metals, Painting and Coatings, Plaster and Gypsum Board, Plastic Composite Fabrications, Project Management and Coordination, Rough Carpentry, Tile, Wall Finishes
VDI, Inc. is a General Contractor, Owner Real Estate Developer, Specialty Contractor that serves the Syracuse, NY area and specializes in Ceilings, Countertops, Electrical, Finish Carpentry, Flooring, General Construction Management, Glass and Glazing, Metals, Painting and Coatings, Plaster and Gypsum Board, Plastic Composite Fabrications, Project Management and Coordination, Rough Carpentry, Tile, Wall Finishes.
Company Logo

Proposabid, LLC

DC, DC • El Paso, TX • Filadelfia, PA • Fort Worth, TX • Houston, TX • Indianapolis, IN • Jersey City, NJ • Kansas City, MO • Los Angeles, CA • New York, NY • Portland, OR • Quincy, IL • San Diego, CA • San Francisco, CA • San Jose, CA • Tampa, FL • Alabama • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Architect, Consultant, Engineer, General Contractor, Specialty Contractor, Supplier
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Communications, Concrete, Demolition, Design and Engineering, Earthwork, Electrical, Electronic Security, Fire Suppression, Heating Ventilating and Air Conditioning HVAC, Landscaping, Masonry, Plumbing, Project Management and Coordination, Roofing, Rough Carpentry, Structural Steel
Proposabid – a Done-For-You “Micro-Bidding” SaaS platform designed to increase speed, time and money through alleviating the burden of staff tasked with sourcing (4) or more Bids from qualified vendors for large-scale rehabs, remodels, renovations and general property repairs. Our specialty is creating the right Scopes of Work - to attract the Right Vendors - at the Right Price - at the Right Time - within 7 business days or less.

company freelanser

Cape Coral, FL • LA, CA • Alabama • Arizona • Arkansas • California • Colorado • Delaware • Florida • Georgia • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • South Carolina • South Dakota • Tennessee • Texas • Utah • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Architect, Consultant, Engineer, General Contractor, Owner Real Estate Developer, Specialty Contractor, Supplier
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Communications, Concrete, Demolition, Design and Engineering, Earthwork, Electrical, Electronic Security, Fire Suppression, Heating Ventilating and Air Conditioning HVAC, Landscaping, Masonry, Plumbing, Project Management and Coordination, Roofing, Rough Carpentry, Structural Steel
company freelanser is a Architect, Consultant, Engineer, General Contractor, Owner Real Estate Developer, Specialty Contractor, Supplier that serves the Brooklyn, NY area and specializes in Communications, Concrete, Demolition, Design and Engineering, Earthwork, Electrical, Electronic Security, Fire Suppression, Heating Ventilating and Air Conditioning HVAC, Landscaping, Masonry, Plumbing, Project Management and Coordination, Roofing, Rough Carpentry, Structural Steel.

Frequently Asked Questions

How many Construction Scheduling contractors in Merlin, OR are on the Procore Construction Network?

There are currently 1,295 Construction Scheduling contractors in Merlin, OR on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Merlin, OR?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Merlin, OR that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Merlin, OR join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Merlin, OR cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Merlin, OR on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.

How many Construction Scheduling contractors in Merlin, OR are on the Procore Construction Network?

There are currently 1,295 Construction Scheduling contractors in Merlin, OR on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Merlin, OR?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Merlin, OR that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Merlin, OR join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Merlin, OR cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Merlin, OR on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.