Construction Scheduling Contractors in Los Angeles, CA

7,461 Results within

Market Sector
Company Type
Business Classification
Trades and Services (79)
Backing Boards and Underlayments
Batten Seam Sheet Metal Wall Cladding
Blanket Insulation
Blown Insulation
Board Insulation
Cast Polymer Fabrications
Cement Plastering
Construction Scheduling
Curtain Wall and Glazed Assemblies
Custom Ornamental Simulated Woodwork
Direct Applied Finish Systems
Escalators
Escalators and Moving Walks
Exterior Insulation and Finish Systems Eifs
Exterior Planting Support Structures
Facility Fuel Systems
Fireplace Specialties
Fireplaces and Stoves
Flashing and Trim
Flat Seam Sheet Metal Wall Cladding
Flexible Flashing
Fluid Applied Insulative Coating
Foamed In Place Insulation
Glass and Glazing
Glass Glazing
Glazed Aluminum Curtain Walls
Glazed Bronze Curtain Walls
Glazed Composite Curtain Wall
Glazed Stainless Steel Curtain Walls
Glazed Steel Curtain Walls
Glazed Timber Curtain Walls
Glazing Accessories
Glazing Surface Films
Gypsum Board
Gypsum Plastering
Heating Ventilating and Air Conditioning HVAC
HVAC Air Distribution System Cleaning
HVAC General
Instrumentation and Control For HVAC
Irrigation
Landscaping
Loose Fill Insulation
Manufactured Fireplaces
Mirrors
Moving Ramps
Moving Walks
Other Plastering
Planting Accessories
Planting Preparation
Plants
Plaster and Gypsum Board
Plaster and Gypsum Board Assemblies
Plaster Fabrications
Plastic Composite Fabrications
Plastic Composite Paneling
Plastic Composite Railings
Plastic Composite Trim
Plastic Foam Fabrications
Plastic Glazing
Polymer Based Exterior Insulation and Finish System
Polymer Modified Exterior Insulation and Finish System
Project Management and Coordination
Reflective Insulation
Sheet Metal Flashing and Trim
Sheet Metal Wall Cladding
Sloped Glazing Assemblies
Special Function Glazing
Sprayed Insulation
Standing Seam Sheet Metal Wall Cladding
Stoves
Structural Glass Curtain Walls
Structural Sealant Glazed Curtain Walls
Supports For Plaster and Gypsum Board
Thermal Insulation
Transplanting
Turf and Grasses
Veneer Plastering
Water Drainage Exterior Insulation and Finish System
Wetlands
Clear All Filters
Company Logo

Pacific Modern Homes Inc.

California
Supplier
Infrastructure, Institutional, Residential
Design and Engineering, Landscaping, Project Management and Coordination, Roofing, Structural Steel
Pacific Modern Homes, Inc. (PMHI) is a private California company that produces wall panels and roof trusses at its factory in Elk Grove. PMHI can trace its history back to the middle 1960s when it began producing wall panels for housing projects in California and Hawaii. PMHI was incorporated in 1968 as Pacific Modules, Inc. Both Pacific Modules, Inc. and its sister company Pacific Buildings, Inc. (founded in Marks, MS) were involved in building houses utilizing their respective packages. At this point both companies worked as general contractors developing their own tracts under joint ventures. In October 1973 our corporate name was changed to Pacific Modern Homes, Inc. By 1980 PMHI had ceased to operate as a general contractor and instead focused on its manufacturing and supplying to contractors, developers, and owner-builders. In 1982 the Licensed Dealer Network was established, allowing for more local representation across California, Nevada, and Oregon. In 1990 PMHI began shipping overseas; to date, PMHI has supplied projects in Belarus, Russia, Kazakhstan, Ukraine, France, Mexico, S. Korea, Japan, Lebanon, and China. Today PMHI is primarily a supplier to the owner-builder market. Services offered include drafting, engineering, contractor referrals, and consulting in addition to manufacturing. Home and land financing is also available.
Company Logo

Cad-Con Design LLC

Boca Raton, FL • Boynton Beach, FL • Delray Beach, FL • Fort Lauderdale, FL • Fort Pierce, FL • Hobe Sound, FL • Hollywood, FL • Homestead, FL • Jupiter, FL • Key Largo, FL • Key West, FL • Lake Worth Beach, FL • Marathon, FL • Melbourne, FL • Miami, FL • New York, NY • Okeechobee, FL • Orlando, FL • Palm City, FL • Pompano Beach, FL • Port St Lucie, FL • Stuart, FL • Vero Beach, FL • West Palm Beach, FL • Arizona • California • Florida • Michigan • Nevada • Texas • Washington
Architect, Engineer, Specialty Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Ceilings, Concrete, Countertops, Curtain Wall and Glazed Assemblies, Demolition, Design and Engineering, Door and Window Hardware, Doors and Frames, Dumbwaiters, Earthwork, Electrical, Electronic Life Safety, Electronic Security, Elevators, Entrances and Storefronts, Escalators and Moving Walks, Finish Carpentry, Fire Suppression, Flooring, Glass and Glazing, Heating Ventilating and Air Conditioning HVAC, Landscaping, Lifts, Louvers, Masonry, Metals, Other Conveying Equipment, Painting and Coatings, Plaster and Gypsum Board, Plastic Composite Fabrications, Plumbing, Project Management and Coordination, Roof Windows and Skylights, Roofing, Rough Carpentry, Scaffolding, Specialty Doors and Frames, Structural Steel, Tile, Translucent Wall and Roof Assemblies, Turntables, Vents, Wall Finishes, Window Wall Assemblies, Windows
Cad-Con Design LLC is a Architect, Engineer, Specialty Contractor that serves the Fort Pierce, FL area and specializes in Ceilings, Concrete, Countertops, Curtain Wall and Glazed Assemblies, Demolition, Design and Engineering, Door and Window Hardware, Doors and Frames, Dumbwaiters, Earthwork, Electrical, Electronic Life Safety, Electronic Security, Elevators, Entrances and Storefronts, Escalators and Moving Walks, Finish Carpentry, Fire Suppression, Flooring, Glass and Glazing, Heating Ventilating and Air Conditioning HVAC, Landscaping, Lifts, Louvers, Masonry, Metals, Other Conveying Equipment, Painting and Coatings, Plaster and Gypsum Board, Plastic Composite Fabrications, Plumbing, Project Management and Coordination, Roof Windows and Skylights, Roofing, Rough Carpentry, Scaffolding, Specialty Doors and Frames, Structural Steel, Tile, Translucent Wall and Roof Assemblies, Turntables, Vents, Wall Finishes, Window Wall Assemblies, Windows.

Frequently Asked Questions

How many Construction Scheduling contractors in Los Angeles, CA are on the Procore Construction Network?

There are currently 7,461 Construction Scheduling contractors in Los Angeles, CA on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Los Angeles, CA?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Los Angeles, CA that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Los Angeles, CA join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Los Angeles, CA cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Los Angeles, CA on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.

How many Construction Scheduling contractors in Los Angeles, CA are on the Procore Construction Network?

There are currently 7,461 Construction Scheduling contractors in Los Angeles, CA on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Los Angeles, CA?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Los Angeles, CA that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Los Angeles, CA join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Los Angeles, CA cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Los Angeles, CA on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.